Feasibility study

What can be built here? And what does it carry.

Place a block on the plot among the buildings that stand. Change the distance to the boundary, floors and prices, and see area, number of dwellings and what the project can carry for the plot, straight away.

The feasibility study in proptrac: a block on the plot in 3D among the existing buildings, assumptions on the right, area and units, land value and unit mix below.
Feasibility study · Example figures

The figures in the screenshot are an example, not an estimate for a particular property. Every starting value can be changed.

01 / Volume

A block on the plot, not a sum.

The study draws the volume on the plot itself, from the Kartverket outline, among the buildings that stand. You see what the distance to the boundary and the cap on built-up area actually give.

  • Distance to boundaryFrom the Planning and Building Act when the plan is silent, and yours to change.
  • Max %-BYAThe zoning plan's cap on built-up area, which sets the footprint.
  • Floors and heightFloor height and the plan's height limit, with a warning when the block gets too tall.
  • Existing buildingsIf buildings stand on the plot, the study says they are assumed demolished.

02 / Area and units

From plot to dwellings.

BYA, BTA, BRA and sellable area are worked out step by step, and the unit mix spreads the sellable area over types, each with its own size and price factor.

  • AreaPlot, built-up area, gross area, usable area and sellable area, with factors you can adjust.
  • Unit mixShare, size and price factor per type, and the number of dwellings that follows.
  • ExplanationThe study says what limits it: the %-BYA cap or the distance to the boundary.

03 / Land value

What the project can carry for the plot.

Sales revenue minus building cost, other costs and the developer's margin gives the residual: what the project can carry for the plot, per m² BRA and per m² of plot. The sum is shown line by line.

  • Sale priceFrom Statistics Norway's price statistics for the municipality, as a starting point you can override.
  • Costs and marginBuilding cost per m² BTA, other costs and margin as separate assumptions.
  • An honest answerIf the residual is negative, the study says the project carries no land cost.
  • Together with plot valuationCompare with plot sales nearby in Plot valuation.

Included in proptrac

280NOKper user / monthExcl. VAT. Everything is included, this too.

No modules and no packages to choose between. Every user gets all of proptrac, with no lock-in — and free during the beta.

More in proptrac